Rework happens.
In fact, a 2013 study by the Lenox Institute of Technology of more than 100 industrial metal-cutting operations found that, “regardless of the percentage of machine uptime reported, respondents admitted that finished products don’t pass first inspection 20% of the time and require rework.”